Bridge over the River IJssel, stand developed

Bridge over the River IJssel, stand developed

Bridge over the River IJssel, stand developed

Rollei Pan 25 at EI 25 in Agfa R09 One Shot 1+100 for 1 hour, agitated for 30 seconds, 5 slow inversions at 30 minutes.

Leave a Reply

Your email address will not be published. Required fields are marked *